KitLog pro

Powered By Kitlog Pro v2.0

Don's RV-8 Build Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-4-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  H.S. Work

I have got to be the slowest builder around..... Finished working on HS-00005 and HS-00006 ribs. Got them clamped in place and drilled center holes of the aft flange for HS-00006 thru the spar and HS-00003 reinforcement. Measured and marked for the top and bottom holes on the fwd spar HS-810 and 814 bars. Clamped HS-00005 back in place and drilled and match drilled thru the fwd spar to drill out the fwd flange on HS-00005. Cleaned up and cleco all together. Happy how things turned out. Curiosity got the best of me about the alignment of the inboard top and bottom of the HS-702 spar with the skins as it is not punched. I marked the holes thru the skins and then uncleacoed the skins to check that my marks were indeed centered on the spar flanges. Looks great all lined up well and I'll sleep better now but a total waste of time.
' style=

Aft inboard rib of left horizontal stab

Aft inboard rib of left horizontal stab

' style=

Fwd inboard rib of left horizontal stab

Fwd inboard rib of left horizontal stab

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.