Powered By Kitlog Pro v2.0
Don's RV-8 Build Site
RV-8
All
11-8-2018
< Previous Log Entry
Next Log Entry >
Date:
11-8-2018
Number of Hours:
1.50
Manual Reference:
Brief Description:
HS Rear Spar work
Clecoed completed bearing bracket to rear spar and drilled to size, #12, through the bracket, spar doubler and spar. Installed the mounting hardware.
Rear spar buildup complete. Moving on to HS Front Spar buildup.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
82
298
Empennage
75
226
Shop
5
67
Tools
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.