Powered By Kitlog Pro v2.0
Don's RV-8 Build Site
RV-8
All
10-8-2018
< Previous Log Entry
Next Log Entry >
Date:
10-8-2018
Number of Hours:
4.00
Manual Reference:
Brief Description:
Rear Spar Work
Match drilled all holes on rear spar reinforcement bars. Clecoed elevator hinge brackets in place and match drilled. Assembeled center elevator hinge/bearing and match drilled left and right bracket thru bearing housing.
Elevator Hinge Brackets
Elevator Hinge Bearing Bracket
Rear Spar
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
82
298
Empennage
75
226
Shop
5
67
Tools
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.