Date:  9-17-2013
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Fabric Painting

After puting away all my painted inspection plates today, I laid out and painted the first load of fabric parts. These were all tail feathers. I decided to to Stewart Systems' advice and just paint them all one side at a time, what a day or two for full cure, then flip them and paint the other side.Side one done.
' style=

Before: pieces and parts all laid out for painting.

Before: pieces and parts all laid out for painting.

' style=

After: the same parts with their base coat applied.

After: the same parts with their base coat applied.