I got the rest of the fabric fitted and glued to the left landing gear. I did the initial shrink and installed the needed reinforcement patches on the frame. I'll let this all dry, then do the other shrinks and tape installation next session. That will be the last of the fabric gluing for the fuselge. Time to start the sprayed EkoFill coats, then move on to the wings.