KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  11-3-2011
Number of Hours:  3.20
Manual Reference:  
Brief Description:  Tape and Inspection Frame Work

I worked on the horizontal stab inspection frames on the left side. Glued the frames in place, let that dry, then cut the fabric on the inside of the frames to glue back onto the frame itself. When that was dry, I glued the doily onto the two inspection areas.
' style=

Front inspection frame ready for doily.

Front inspection frame ready for doily.

' style=

Rear inspection frame ready for doily.

Rear inspection frame ready for doily.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.