KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  10-18-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Left Side Fabric Work

Finished up the framing and gluing of the left side fabric. I started with the vertical stab area and got the fuselage to vertical stab area to blend nicely. Then I went to the front and worked on the top birdcage and window area. Got all the edges final glued and will let them dry overnight before I do the initial shrink.
' style=

Vertical stab area trimmed and glued down.

Vertical stab area trimmed and glued down.

' style=

Window area trimmed to size and ready to tuck the edges into the window slot.

Window area trimmed to size and ready to tuck the edges into the window slot.

' style=

Left side fabric ready to shrink.

Left side fabric ready to shrink.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.