Finished up the framing and gluing of the left side fabric. I started with the vertical stab area and got the fuselage to vertical stab area to blend nicely. Then I went to the front and worked on the top birdcage and window area. Got all the edges final glued and will let them dry overnight before I do the initial shrink.
Vertical stab area trimmed and glued down.
Window area trimmed to size and ready to tuck the edges into the window slot.