KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  11-29-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Generator Clean-Up

I removed the generator from the engine, dis-assembled the unit, cleaned the unit, and replaced the two ball bearings. I then re-assembled the generator and painted the exterior. It's now all set to re-install on the engine.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.