KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  10-20-2014
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Wing Detail Work

Today, I finished the hook-up on the ailerons and have their control cables attached at the control suface end. I started to work on connecting the cables that run to the control sticks and got everything together except one connection where I saw a bit more corrosion on a part than I would like, so I ordered a new link for it. Should be here from Univair in a few days. I went ahead and fitted the pitot and static line connections where they come into the fuselage, plus installed the fuel tank vent line hose from the tank to the vent hard lines inside the fuselage. Also, I started fitting the wing root fairings, starting with the top fairing. All these are new, so I have to drill all new holes. That's going to take a while to get it to look good but it will be worth it.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.