I finished up the tank bay area gluing work on the right wing. After trimming the extra fabric away, I did the first shrink on the top fabric. Also, I mounted both fuel tank bay covers back onto the wing. They both have been completely screwed down to ensure a good alignment and fit. Lastly, I went around and ironed down any loose tidbits of fabric and set both wings up to be flipped over where I can start work on the bottoms.