KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
' style=
Date:  10-15-2016
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Install static ports and static lines

0830-1730: Install static air ports and lines. Drilled right side static port hole in fuselage bigger than called for. able to install rivets same as on left side.

1845-1945: Begin fabrication of ADHRS platform.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.