0900-1200: drill armrests to skin and bulkheads. Mark the skin with rivet size callouts. squeeze aft fuselage longeron rivets. 1230-1630: Christine riveted skins bottom and aft of F705 bulkhead 1830-2000: Christine riveted Left and right sides up to F704 bulkhead. Installed and torqued bolts.