KitLog pro

Powered By Kitlog Pro v2.0

Swami's Web Site
' style=
Date:  6-26-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  tunnel cover

0715-0845: Prep and prime baggage floors + 7111 ribs. Cut soundblock for baggage area.
1315-1615: Fabricate and drill seat hinges to seat pan.
1930-2100: Fabricated F741A/B tunnel cover channels and tunnel cover.

Finished installing the angle to seat rib # 6 and F704 spar.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.