KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  9-29-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Rolling the elevator leading edges.

Today Parker and I rolled the leading edges of the left and right elevators, a task we dont enjoy. The leading edges were squeezed together and blind riveted in place. The end result was quite good.
' style=

Elevator leading edge rollled and riveted.

Elevator leading edge rollled and riveted.

' style=

Very pleased with the end result.

Very pleased with the end result.

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.