KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  4-27-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Preparing the left Elevator.

Used the two holes in the forward face of the left counterbalance (C/B) weight skin E-713, as a drill guide and used a #28 bit to make pilot holes in the C/B weight and then drilled to #12.

Removed the lead C/B weight and clecoed the E-703 end rib, E-704 C/B rib, E-713 C/B skin subassembly to the left E-702 elevator spar.

Clecoed the E-705 left root rib to E-702.

Final drilled to #40 E-705 and E-702.

Slid the left elevator understructure into the E-701 left elevator skin and clecoed all together.
' style=

Counterbalance assembly clecoed in place.

Counterbalance assembly clecoed in place.

' style=

E-705 root rib clecoed in place.

E-705 root rib clecoed in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.