Powered By Kitlog Pro v2.0
Davids Web Site
RV-8
Elevator
4-9-2015
< Previous Log Entry
Next Log Entry >
Date:
4-9-2015
Number of Hours:
3.50
Manual Reference:
Brief Description:
Preparing the elevator skin and stiffeners.
Today Parker and I match drilled the elevator skin to all the stiffeners.
Trimmed the 6 J,K,L, stiffeners to lengh as shown on the plans.
Removed the vinyl from the stiffeners, trim reinorcement plate, and the inside of the elevator skins.
Cut strips of vinyl from around the rivet holes in the elevator skins with hot soldering irons.
Deburred and dimpled the elevator stiffeners.
Deburred the elevator skins,
Cutting away vinyl strips aound the rivet holes.
Dimpling the elevator stiffeners.
Added a laser pointer to the DRDT2
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
235
678
Avionics
1
3
Brake System
4
10
Canopy
4
6
Electrical Wiring
4
12
Elevator
18
50
Empennage
46
119
Engine
32
86
Fuel System
4
18
Fundamentals Class
1
8
Fundementals Class
1
8
Fundementals of Buil
1
8
Fuselage
82
261
Practice kit
1
3
Wings
36
86
Copyright © 2001-2024 Matronics. All Rights Reserved.