KitLog pro

Powered By Kitlog Pro v2.0

Derek & Kims RV-9A Build Log
' style=
Date:  5-11-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Nose Gear Assemble

INstalled the Beringer nose wheel and fork on to the nose gear leg. Installed the Antispalt aero nose job too, (nose leg reinforcement)
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.