KitLog pro

Powered By Kitlog Pro v2.0

Derek & Kims RV-9A Build Log
' style=
Date:  1-26-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Static Line

I installed the white static line tubing to the static ports in the rear fuselage. I adhered some Clickbond zip tie stanchions to the rear bulkhead and skins to secure the lines in place. While I was at it I dropped in about a half a dozen other stanchions on the floor of the rear fuse for future wire bundles to be fastened
' style=

Dual Static Ports

Dual Static Ports

' style=

Rear Fuselage Static Line routing

Rear Fuselage Static Line routing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.