KitLog pro

Powered By Kitlog Pro v2.0

Derek & Kims RV-9A Build Log
' style=
Date:  1-6-2013
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Panel and throttle brackets

I primed and riveted all the panel and vent brackets in place. I also positioned the throttle bracket that fastens to the bottom of the panel and installed nutplates to the panel that will support the bracket.

I installed two sets of nutplates; one to mount the bracket at the location shown on the plans and a second set to mount the bracket where I think I will prefer it better.

The plans show a very precise dimension to the location of this bracket but it doesn't work real well with my switch layout. I cant see what harm can be done by moving the throttle over about 1/1-4" but just in case I find out in the future that it needs to go there, I will already have the nutplates installed and it will be easy to move.
' style=

Panel Brackets riveted in Place

Panel Brackets riveted in Place

' style=

Nut Plates for Throttle Bracket

Nut Plates for Throttle Bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.