KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  4-1-2012
Number of Hours:  9.00
Manual Reference:  Section 5
Brief Description:  Preparation of wing skins and jigs

Randy helped me yesterday to prepare the wing skins for priming, the skins were washed and prepared with metalink. Following that a good solid coat of primer was given the the skins.

I then built the jigs required for the building of the fuel tanks and the leading edges, I need to prime some of these parts but as I will have lots of stuff to do now with the wing skins I probably wont worry about that until I have the wing skins done. At that point it will be warm enough to do outside.

Cleaned up the garage and prepped the bench for more work. Wow that was a productive fun day.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.