KitLog pro

Powered By Kitlog Pro v2.0

Davids Web Site
' style=
Date:  2-17-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  match drilling of empennage

After over drilling threerivets on the left side of upper fin(looking from rear of plane) I talked with Vans and will rivet those holes with overiszed flush rivets. I have match drilled the line of holes to the end of the fin with #40 drill which is correct for AD3 - 3.5 rivets or 3/32.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.