This is a catch-up posting of lots of construction happening over 2011. All work focused on the right wing and included partial fuel tank sealing, slosh door installation, fuel probe installation, aileron pushrod and housing installation, speed brake installation, fuel pickup installation (and removal of 3/8" finger strainer and replacement with 1/2" finger strainer), and fuel pass-through tube through main spar.