Powered By Kitlog Pro v2.0
Damiens Web Site
RV-8
Empennage
9-24-2017
< Previous Log Entry
Next Log Entry >
Date:
9-24-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
Elevator stiffener prep
Cleco'd the stiffeners to the left and right elevator skins (E-701-R, E-701-L) and match drilled the holes. Drilled the missing holes in some of the stiffeners using the holes in the skins as a guide. Disassembled and deburred all drilled holes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
101
293
Empennage
95
286
Inventory
1
2
Shop Setup
2
2
Wings
3
3
Copyright © 2001-2024 Matronics. All Rights Reserved.