KitLog pro

Powered By Kitlog Pro v2.0

Roberts Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-16-2007
Number of Hours:  2.50
Manual Reference:  Front gear
Brief Description:  Corrected front gear

Finished bolting left and right gear checked alignment for 1 Deg. toe in AOK.
Rivited door supports to root tube. Front gear was hooked up to foot peddles backwards
so we unbolted the puch rods and spun the Gear 180 Deg. to it's correct possition. Then rebolted the push rods. (they still have to be calibrated and the gear has to be checked to see if it is centered.
' style=

push rods put on backwards

push rods put on backwards

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.