KitLog pro

Powered By Kitlog Pro v2.0

Dan & Andrew's Web Site
' style=
Date:  5-7-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  More L & R Wing Tank Work

Today I finished match drilling all holes on the right wing tank and baffle. I then match drilled the end z-brackets R1 & R7. After removing the skin and middle ribs, I match drilled the baffke to z-brackets R2 thru R6, After deburring and priming the right tank z-brackets, I installed all platenute on Left and Right z-brackets and final bolted them to the respective wing spar. I need help to rivet the L7 & R7 platenuts to the spars as these rivets need to be bucked....will wait for Andrew to help with that. I'll then be able to bolt on the #7 z-brackets. Next is preping/platenutting the joint plates and starting work on the tank stiffeners.
' style=

Match drilled baffle right wing tank

Match drilled baffle right wing tank

' style=

All Z-Brackets primed & platenutted

All Z-Brackets primed & platenutted

' style=

L & R Z-Brackets final bolted to wing spars

L & R Z-Brackets final bolted to wing spars

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.