KitLog pro

Powered By Kitlog Pro v2.0

Dan & Andrew's Web Site
' style=
Date:  5-5-2014
Number of Hours:  0.70
Manual Reference:  
Brief Description:  More Left Wing Tank Work

Today I installed 1 pop cherry rivet into a hole on the right wing spar/rib. This rivet was drilled out, deburred and primed prior to installing the pop rivet. I also removed all 7 left wing tank z-brackets and deburred. Next session will be more left wing tank work.
' style=

1 rivet drilled out, re-preped & primed

1 rivet drilled out, re-preped & primed

' style=

Installed Pop Cherry Rivet

Installed Pop Cherry Rivet

' style=

Deburred all left wing tank z-brackets

Deburred all left wing tank z-brackets

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.