KitLog pro

Powered By Kitlog Pro v2.0

MARV'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-1-2005
Number of Hours:  40.00
Manual Reference:  
Brief Description:  Landing gear constructed by previous owner

Using information from previous builder's son (original builder is deceased), And past building/fabrication experiences; The construction time to complete the three gear components (two Mains, and one Tailwheel assembly), is estimated at 48 Manhours. This is further broken down as 20 manhours per main gear, and 8 manhours for the tail gear assembly. The three images depict the (1) left main gear, (2) Both main gear, and (3) Tail wheel assembly.
' style=

Left Gear

Left Gear

' style=

Both mains (right gear is wrapped)

Both mains (right gear is wrapped)

' style=

Tail wheel Assy.

Tail wheel Assy.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.