Wing 3 and 4 09/23/2018 - Cut out dailies most of the day and installed 7 on wing 3. The next step after the inspection rings and dolies will be the tapes. That will finish up wing 3. Chuck had to make some parts for wing 4. Some metal and some wood, to be able to use screws to put a metal cover over this aileron control station. Last modified: Sep 23, 2018