KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
' style=
Date:  2-10-2014
Number of Hours:  4.00
Manual Reference:  WIX-F11
Brief Description:  Zee Tunnel

Spent the day positioning and drilling the front Zee tunnel cross piece and also the aft tunnel web. This assembly is where the left and right spars cross through in to the fuselage and lock into place to lift the aircraft up.

I also drilled throught the lower front floor sheet into the tunnel pieces so it is clecoed into the floor and also the sides.

I drilled all the holes to No.40 size.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.