Brief Description: Tail box, also deburr and prime remaining pieces
Today I continued with upsizing the drill holes to No.30 and also to 3/16 where bolts were required. I positioned the Rudder hinge as well and drilled the hinge in. All holes have noe been drilled to size and I was then able to deconstruct the box assembly and deburr the holes. this was relatively simple. I also removed the top left and right longerons to debur and prep for priming. I had to prime upper cross tie 3 that was not done, a cross tie clip for th cross tie box 1, the tail post strengthening strap and a couple of splice plates.
These have been primed and are ready for installation tomorrow.