KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
' style=
Date:  8-29-2012
Number of Hours:  3.00
Manual Reference:  WIX-F24
Brief Description:  Lower Cross tie drilling

I turned the left and right fuselage side upside down and positioned them within my 40 inch bench fences at the bend line. I then attached the 2.5 inch tail channel piec to get the spacin correct along the line of symmetry. I then ensure that all sides were level and packed it to level. Then starting from the ront end I added first cross tie and positioned with the squares with the vertical channels clamped both sides, re-checked and then drilled the cross tie and clecoed. I repeated thi step for Lwer crooss tie pieces 2 and 3 also. I have two more to do after I go to work.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.