The fuel filler box requires bending of the preformed pieces to be able to rivet together. The window strap was prepared also to take the Southco fasteners. I have also had to rearrange my shed to be able to attach the front fuselage to the rear half. This will then largely fill one side of my L shaped shed.
I also prepared the see tunnel assembly pieces as per the plans. measuring and cutting out the shapes. the hole were then prep drilled ready for a later workstep.