I continued with locating the angle pieces as per the plans and drillling to 40 size from pilot holes. there are any angle pieces and also gusstes to build strength into this panel whcih is the side wall to the cockpit. 2 more gussets remaining and the flap access doubler to place and drill tomorrow.
Awaiting to find a phenolic strip to do on the top longeron.