KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
' style=
Date:  9-15-2011
Number of Hours:  4.00
Manual Reference:  WIX-W14
Brief Description:  Left Main Spar - Drilling

"Today I continued to drill all the holes requiredin the spar upto Size 30 copper Cleco size. All angle pieces and attachments have been located and drilled as well.

I now have to follow the plans to upsize those holes to the final size and then start the dimpling and counter sinking.

The spar is going much faster this time round with a better sequence to getting it together. I feel happier about this and not as worried as I was with the first one. It is going Ok so far!"
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.