KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
' style=
Date:  8-29-2011
Number of Hours:  4.00
Manual Reference:  WIX-W14
Brief Description:  Right Main Spar - Final rivetting Rt Spar

"Finally now at least 1 of my kids are at school I got the chance to get in the shed and do some work. It is 34 Celsius outside and I reckon about 38 inside. Lots of water drinking happening.

I was able to get a good run at rivetting from outside the wingroot point from the fuselage section to the tips both top and bottom. I had to drill out about 8-10 rivets and redo them. By enlarge it has worked out fine and is the definite 'practice spar'. Hopefully I will be much qicker with the left spar. I will get some photos once I tidy it up and touch it up with the primer as there has been a bit of paint come off with the bucking bar and general shifting around of the spar during this stage. But it is not too bad considering the treatment.

I will now finish the left Stabilator which has been waiting for me."
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.