KitLog pro

Powered By Kitlog Pro v2.0

Hong Kong Waiex
' style=
Date:  6-2-2011
Number of Hours:  3.00
Manual Reference:  WIX-T08
Brief Description:  Left Stabilator - Preparation

"I had already cut to length the pieces of C Channel required so today was about marking out and cutting the pieces as per plans. I then drilled the pilot holes in the C Channel spars and tidied up all the burrs and edges. I measured out on the bench the Left frame rib positions for my jig and layed out the pieces appropriately. Starting from the tip I lined it up and drilled the first holes joining the rear spar to the tip. I worked out frm there to the stab root drilling the aprs and ribs and clecoing together.

I left it there as I ahve to do the Left Hocky stick bend but that will be in about 5 days as I have to goto Delhi, London, Milan and back to HK. Some time away from the project will be good to think about it and also to go throught the Aircraft Spruce catalogue to see what else I need to or would like to order. I am thinking about the C Arm rivet device and a few air drill pad pieces for deburring and some nut lock indicating marker paste."
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.