KitLog pro

Powered By Kitlog Pro v2.0

Ricks Web Site
' style=
Date:  7-6-2020
Number of Hours:  5.50
Manual Reference:  
Brief Description:  Finish setup and begin to measure for struts

After being satisfied that we had the fuselage and floats correctly oreineted we installed the Zenair float strut end fittings to the various float and airframe fittings and began to measure the lengths we would need to cut the strut material too.

After roughly measuring the strut length, I cut some 1 inch angle iron and clamped it to the Zenair strut end fittings to hold them in alignment to get a more accurate measurement before cutting the strut material.
' style=

Measuring

Measuring

' style=

Measuring

Measuring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.