The last major step before leak checking the floats, installing the last few pieces and painting them. These jobs need to wait for spring. We got the floats parallel and square to within 1/8" and got them leveled to within .1 degrees. We then clamped on the drill jig I had designed and 3D printed. It proved to work very well to keep the holes on the center of the steel tube inside the spreader bar.