Powered By Kitlog Pro v2.0
Falcon XP Build Site (Claude)
Falcon XP
Landing Gear
7-29-2011
< Previous Log Entry
Next Log Entry >
Date:
7-29-2011
Number of Hours:
3.00
Manual Reference:
Brief Description:
Making Nose Gear
I decided to create the nose gear legs (which straddle the wheel and tire, and connect to the nose gear rod) as two pieces instead of one single piece.
Two nose gear legs matched together.
Pending the 1/4" Aluminum.
Finished nose gear legs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Falcon XP Home
Category
# Logs
# Hours
All
87
217
Controls
4
10
Engine
1
1
Fuselage
29
50
Landing Gear
18
60
Miscellaneous
9
20
Painting
19
62
Tools
7
14
Copyright © 2001-2024 Matronics. All Rights Reserved.