Powered By Kitlog Pro v2.0
Falcon XP Build Site (Claude)
Falcon XP
Fuselage
1-3-2012
< Previous Log Entry
Next Log Entry >
Date:
1-3-2012
Number of Hours:
2.00
Manual Reference:
Brief Description:
Forward Seat Fiberglassing, Upper-Up
After the fiberglass resin on the lower area of the forward seat had dried, fiberglassed the top portion. Same process as before.
Once that had dried, I trimed the outside areas of the seat, and tested the fit in the fuselage.
The two pictures show the test fit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Falcon XP Home
Category
# Logs
# Hours
All
87
217
Controls
4
10
Engine
1
1
Fuselage
29
50
Landing Gear
18
60
Miscellaneous
9
20
Painting
19
62
Tools
7
14
Copyright © 2001-2024 Matronics. All Rights Reserved.