KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
< Previous Log Entry          Next Log Entry >
' style=
Date:  8-1-2006
Number of Hours:  5.50
Manual Reference:  
Brief Description:  installed a/c dryer, prepared for de-ice leading e

installed dryer for airconditioningprepared for leading edge de-ice system bondingsecured routing of hydraulic lines with Adel clamps
' style=





' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.