KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  7-13-2006
Number of Hours:  14.00
Manual Reference:  
Brief Description:  installed nutplates for inspection cover, drilled

drilled holes, counter sink and rivet nutplates into place for elevator inspection coverafter ensuring that fuselage is level & vertical stab perpendicular to level, drilled and clecoed LH vert stab into positiontrimmed LH vert stab for proper fitused Hysol to bond RH vert stab section where previously unbondedlaminated 2 BID around above areas
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.