KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  7-10-2006
Number of Hours:  12.50
Manual Reference:  
Brief Description:  finalized RH vertical stab placement, checked alig

finalized RH vert. stab/rudder position and placementensured trailing edge of rudder was vertical and that horizontal stab & wings were levelprepped area, mixed Hysol and bonded RH vert stab/rudder to fuselage and cleoed into positioncleaned all areas of excess Hysolchecked alignment and bonded (2) bulkhead elevator p/p tubes into place with Hysol
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.