Brief Description: finalized RH vertical stab placement, checked alig
finalized RH vert. stab/rudder position and placementensured trailing edge of rudder was vertical and that horizontal stab & wings were levelprepped area, mixed Hysol and bonded RH vert stab/rudder to fuselage and cleoed into positioncleaned all areas of excess Hysolchecked alignment and bonded (2) bulkhead elevator p/p tubes into place with Hysol