KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  7-6-2006
Number of Hours:  16.00
Manual Reference:  
Brief Description:  set up RH vertical fin to proper position, install

re-confirm fuselage is levelset RH vertical fin half to proper angle of sweepusing pumb bob, assure trailing edge is on centerline of fuselage and is perpendicular to horizontaldrill and cleco RH vertical half into proper position for bonding at a later time and removeinstalled elevator halves after trimming inboard edges for clearance to fuselageclamped elevators to neutral positionset elevator idler arm to 10° for neutral as per book figuresremoved rod end receptical from aft elevator p/p tube for later usecut aft elevator p/p tube to proper length when elevator and idler arm are neutralsetting elevator crossover tube to full down elevator position marked for bulkhead p/p mechanismsdrilled holes for elevator p/p mechanisms
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.