trimmed carbon fiber flange on rear seat bottominstalled nutplates on rear seat area floor panel coving hydraulic linesinstalled floor cover w/ proper screwsinstalled spiral wrap on hydraulic lines under cover to prevent chafingfilled edges w/ micro of rear baggage lower bulkhead for wiring pass throughsanded above when curedstarted installation of pressurization control valve--water drain fitting