completed rudder cable installationfinished forward cable loopclamped rudder pedals and rudder bellcrank to neutral positionclamped rudder cables and cut to proper lengthinstalled (2 each) Nicopress sleaves per turnbucklefinished with heat shrink tubingprepared to take wings off for de-ice cuffs installation by lowering landing gear and removing tail stand