KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  2-1-2005
Number of Hours:  60.00
Manual Reference:  2/1-6/05
Brief Description:  Gear doors elevator

Gear doors were clecoed/screwed in place. Trimmed and rechecked x 10 at least. Elevator was micro'd and body worked x 3. Gear door lay-ups done with subsequent sanding. Control sticks installed . Sticky action. Re shimmed -better. Drag with roll so phenolic wafer in control box was releived and now mich better.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.