KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  7-14-2006
Number of Hours:  13.50
Manual Reference:  
Brief Description:  located LH elevator insp. cover, laminated for rei

installed LH vert fin to mark location for elevator insp. coverlaminated 3 BID reinforcement for LH cover flangedrilled holes and installed conduit and coax for possible NAV antenna in tailfabricated bulkhead for area just aft of NACA duct in tailinstalled nutplates for RH insp. coverreceived rod end recepticals from Lancair and prepped tubing for installation on Monday
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.