Brief Description: installed nutplates for inspection cover, drilled
drilled holes, counter sink and rivet nutplates into place for elevator inspection coverafter ensuring that fuselage is level & vertical stab perpendicular to level, drilled and clecoed LH vert stab into positiontrimmed LH vert stab for proper fitused Hysol to bond RH vert stab section where previously unbondedlaminated 2 BID around above areas