KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
' style=
Date:  3-22-2006
Number of Hours:  90.00
Manual Reference:  3/22-27/06
Brief Description:  Winglets/fuel system/center console/pedestal

I got to rediscover how much I hate capstripping process this week when I put the winglets together. Process is put on wings with flaps and ailerons, level airplane in pitch and roll. Use laser to create center line and meausre out to tips to get reference lines for winglets Mount lower winglet and get it cleco'd inplace the use reference line s and plumbobs for orientattion to the long axis of the plane. Then apply cut ,beat swear at and pray to the top skins to get them to fit. When they do you remove it all and bond them together using capstrips. Make sure you bond it a fuel vent and a nav antenna before you close them out. My partner created tunnel covers for the fuel and hydraulic lines and then finished the center pedestal after I finished the fuel lines. We also made also made covers for the rear wing bolts with fuel bulk head fittings and access doors.
' style=

How could there be 50 hours in these

How could there be 50 hours in these

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.